System Architecture
Complete system topology for Grid + PV + BESS + Diesel hybrid power
System Topology
- Grid connection with automatic transfer via STS
- Solar PV array with DC/AC coupling options
- PSN Energy BESS as central energy hub
- Diesel generator for hybrid backup
- Factory load with critical and non-critical segmentation
Power Flow
- Bidirectional power flow between BESS and AC bus
- PV generation prioritized for self-consumption
- Excess PV charges BESS before grid export
- Diesel generator synchronized through STS
- Seamless grid-off-grid transition
Protection & Safety
- DC and AC circuit breakers at each connection point
- Surge protection devices (SPD) on all inputs
- Fire suppression system integrated in BESS cabinet
- IP54 cabinet protection, IP67 battery modules
- Isolation transformer option for galvanic separation
Need Technical Support?
Our engineering team is ready to help with system design, sizing, and commissioning.